← All field notesPeople & control

AI agent governance checklist for your first pilot.

A working checklist to turn a promising use case into a bounded, reviewable pilot.

The lesson

A pilot is ready when the team knows what it is testing and who owns the result.

Short answer. A first AI agent pilot should have a bounded task, a named business owner, appropriate data and connector access, explicit human review points, representative test cases and agreed success and stop conditions. The team should measure useful outcomes alongside corrections, exceptions, review effort and estimated cost before deciding whether to expand.

Write the pilot contract before configuring the role.

A pilot is a learning exercise with a defined boundary. Describe one recurring task, the person who owns it, the information needed, the expected result and the actions that remain out of scope. A vague objective like “see what AI can do” makes the results difficult to interpret.

For weekly project reporting, define which updates may be gathered, what sections belong in the draft and how the agent should identify missing or conflicting information. Decide who can use the role and who reviews the report before sharing it.

Agree what would make the team pause. Examples include unexpected access, a proposed action outside the task, missing review coverage or repeated unsupported details. Decide who is notified and how the pilot can be paused or adjusted using the available product controls.

Take this with you

A pilot needs a clear task, an owner, boundaries and a decision rule.

Follow the flow

A pilot with a clear decision at the end

Set scope

Choose one report, its owner, inputs, expected output and excluded actions.

Under the hood

Write down the role purpose and sample cases, including a request outside the pilot boundary.

Configure access

Connect only the approved sources and tools needed for preparation.

Under the hood

Check actual account permissions and document any workspace-specific limitations.

Run and review

Try normal reports, missing updates and conflicting information with the project lead.

Under the hood

Keep the review point explicit; capture corrections and stops through the agreed operational process.

Decide

Compare outcomes with baseline measures and the agreed continue, adjust or stop criteria.

Under the hood

Document assumptions, unresolved issues and any changes required before a wider rollout.

Follow a fictional weekly reporting pilot from scope through evaluation.

Test normal work and the cases that should stop.

Prepare a compact test set before regular use. Include a typical task, incomplete inputs, conflicting information, an unavailable connection and a request outside the defined scope. Use data approved for the pilot and check that the connected account has only the permissions the task needs.

For each test, ask whether the result is useful, whether it is supported by the available context, whether uncertainty is visible and whether the right person receives the handover. Record corrections and how long review takes. A fluent draft is not enough if the owner has to re-check every source from scratch.

Run the tests in the workspace and configuration the team intends to evaluate. Feature availability, connector behavior and cost depend on setup. Capture any assumptions or limitations instead of treating a demonstration as proof of a production-ready workflow.

Under the hood

Use a repeatable test record: input case, expected behavior, observed result, reviewer action and follow-up. Confirm the behavior of retries, interrupted tasks and connected-service actions when those paths are relevant.

Take this with you

The exception cases often tell you more about readiness than a smooth demo.

End with a decision, not a vague impression.

Compare results with the current process. Measure preparation time, completeness, corrections, missed information, follow-up effort and acceptance by the intended reviewer. Include exceptions and the time needed to resolve them so the pilot does not hide work that moved elsewhere.

Add estimated model usage and cost, then account separately for platform charges, connected services, setup, support and human review. UseGlic’s Command Centre cost figures are estimates and may differ from provider invoices; make the measurement boundary clear.

At the review date, choose among continue, adjust or stop. If continuing, state what changes in the task, users, permissions or review plan and who approves that change. A small, evidence-based next step is more useful than an automatic expansion to a larger workflow.

Take this with you

Set a review date and success, adjustment and stop criteria before the pilot begins.

What should an AI agent pilot include?

Include the task and out-of-scope cases, owner, approved inputs and connections, review boundaries, normal and failure tests, a measurement plan, and criteria for continuing, changing or stopping.

How long should an AI agent pilot run?

Run long enough to see representative normal and exception cases, but set a review date in advance. Duration depends on task volume, variability and risk; calendar time alone is not evidence of success.

When should we stop an AI agent pilot?

Pause or stop when the workflow exceeds its agreed scope, a consequential failure occurs, required access or review is unavailable, or results do not justify the cost and effort. Define escalation and rollback steps before starting.

Written by Team UseGlic

Team UseGlic is the product and engineering team building the Command Centre. We build AI teammates around business roles, connected tools and clear ownership. These notes share the product decisions and practical lessons behind that work.

More about our work ↗
Put the idea to work

Every team has
a place to start.

Define the first job, connect your tools and give the work a clear owner.

Create your workspace ↗